Oposiciones →
Module 2 of 8 · 20 min

Who is who on site and which documents rule

Free construction site safety (20 hours) course: read the module, review with the questions and move on to the next one. At the end, a test and a PDF certificate.

Module 2 of 8 · Course contents

The roles on site (Royal Decree 1627/1997, article 2; Law 32/2006, article 3)

  • Client (promotor): the person on whose behalf the works are carried out.
  • Contractor: takes on, before the client, the execution of all or part of the works.
  • Subcontractor: takes on, before the contractor (or another subcontractor), parts or installations of the works.
  • Self-employed worker: works personally without an employment contract; if they employ others on site, they count as a contractor or subcontractor.
  • Site management team (dirección facultativa): the technicians who direct and control the execution.
  • Health and safety coordinator during execution: a competent technician who is part of the site management team; appointed by the client when more than one company, or a company and self-employed workers, take part (article 3.2).

Health and safety study or basic study (article 4)

The client must commission a health and safety study in the project if any of these applies: contract execution budget equal to or above 75 million pesetas (the figure still reads that way in the consolidated text); duration over 30 working days with more than 20 workers at the same time at some point; labour volume over 500 working days; or works on tunnels, galleries, underground pipelines and dams. In all other cases, a basic study.

The health and safety plan (article 7)

It is drawn up by each contractor from the study, approved by the coordinator (or the site management team if there is no coordinator) and must be permanently on site, available to the site management team. It is the document that says how work is done safely on that particular site.

The site books

  • Incident book (article 13): for monitoring the plan; duplicate sheets; always on site, held by the coordinator or the site management team.
  • Subcontracting book (Law 32/2006, article 8): one per contractor and site, always on site; it records in chronological order each subcontract, its level, its object, who manages each subcontractor and the date the relevant part of the plan was handed over.

How far subcontracting can go (Law 32/2006, article 5)

The contractor subcontracts to subcontractors or self-employed workers; the first and second subcontractor may subcontract again; the third may not. A self-employed worker may not subcontract, nor may a subcontractor that only provides labour (with no equipment of its own other than hand tools). Only in justified unforeseen cases may the site management team authorise one more level, recording it in the subcontracting book.

In practiceYou work for a plastering subcontractor that came in through another bricklaying subcontractor. Your company is a «second subcontractor»: it may subcontract once more, but whoever comes after may not. Your names and the date you received your part of the plan must appear in the subcontracting book.

Source: Real Decreto 1627/1997, disposiciones mínimas de seguridad y salud en las obras de construcción (construction sites, consolidated text, in Spanish), articles 2, 3, 4, 7 and 13 · Ley 32/2006, reguladora de la subcontratación en el sector de la construcción (Construction Subcontracting Act, consolidated text, in Spanish), articles 3, 5 and 8

Quick review

Check that you've understood. These are questions from the final test: tap an answer to see whether it's right and why.

Who appoints the health and safety coordinator during the execution of the works?

Who draws up the site's health and safety plan?

Where must the incident book be?

Module practice test

6 new questions, different from the final test. Tap an answer to see whether it is right, why, and which rule it comes from.

1. A self-employed worker who employs other workers on site: how are they regarded?

2. When is a basic health and safety study enough instead of the full study?

3. Which works always require a full health and safety study, whatever their size?

4. Who approves the health and safety plan before the works start?

5. Which subcontractor may not subcontract even if it is the first?

6. Who may, exceptionally, authorise one more level of subcontracting?

Course contents